ABB delivers DolWin2 offshore wind connection

By Michelle Froese ABB has successfully commissioned and handed over the DolWin2 offshore wind transmission link to the Dutch-German transmission system operator TenneT.
ABB has successfully commissioned and handed over the DolWin2 offshore wind transmission link to the Dutch-German transmission system operator TenneT.
DolWin2 is the third offshore wind connection project that ABB has executed for TenneT in Germany’s North Sea, following BorWin1 and DolWin1.
“We are very pleased to have successfully commissioned and handed over the DolWin2 project and would like to thank TenneT for their continuing trust and cooperation,” said Claudio Facchin, President of ABB’s Power Grids division.
The high-voltage direct current (HVDC) link connects

Read Full Article Here

For more great articles: Windpower Engineering & Development

(Visited 4 times, 1 visits today)

Comments

comments



© 2014 RenewaNews