Acciona begins operation of hybrid wind & storage plant

By Michelle Froese ACCIONA Energía has started up the first hybrid plant for storing electricity in batteries that is part of a grid-connected wind farm in Spain. The company has also developed simulation software that will be used in the plant, for which it has been awarded the ‘Eolo Innovation’ prize for by the Spanish Wind Energy Association (AEE).
These two projects make the company a pioneer in this kind of solutions, aimed at facilitating the integration of variable-generation renewables into the grid and optimizing the management of the power produced.
Located in Barasoain (Navarra, northern Spain), the plant is equipped with a storage system

Read Full Article Here

For more great articles: Windpower Engineering & Development

(Visited 5 times, 1 visits today)

Comments

comments



© 2014 RenewaNews