Ground-mount pre-assembly aids work speed on solar projects

By Kelly Pickerel From more than two decades working as a solar installer in Northern California, I’ve learned that ground-array jobsites can become congested, compromising timelines. Construction requires a series of tasks to be completed as quickly as possible, including:
Augering foundation holes
Building sub-structures
Pouring concrete
Installing the racking and modules
… the list goes on.
The problem is most jobsites have minimal extra workspace. Having to wait until one task is completed before starting the next slows down overall construction.
The solution
I’ve found that performing tasks off-site in a controlled environment greatly reduces the workload once on site. And the data backs this up—“prefabricating” in construction projects has

Read Full Article Here

For more great articles: Solar Power World

(Visited 5 times, 1 visits today)

Comments

comments



© 2014 RenewaNews