It Takes Two to Tango…

By Offshore Wind The second GE’s Haliade 150-6MW wind turbine was installed off Block Island in the United States last night, according to a Twitter post by Deepwater Wind’s CEO Jeff Grybowski. All five wind turbines are expected to be installed by early September, with the Block Island Wind Farm planned to be put into full operation by the end of the […]

Read Full Article Here

For more great articles: Offshore Wind » News by topic

(Visited 6 times, 1 visits today)

Comments

comments



© 2014 RenewaNews