Kuubix Construction Group installs 126-kW solar project for chemical manufacturer

By Kelsey Misbrener Hydrite has completed the installation of its first on-site solar array at the company’s Visalia, California facility. The 126-kW solar PV system, completed by Kuubix Construction Group, will provide roughly 16% of the location’s annual electricity consumption. Hydrite’s new solar array at its Visalia, California facility reflects a company-wide focus on improving operational efficiency and…
The post Kuubix Construction Group installs 126-kW solar project for chemical manufacturer appeared first on Solar Power World.

Read Full Article Here

For more great articles: Solar Power World

(Visited 1 times, 1 visits today)

Comments

comments



© 2014 RenewaNews