Standard Solar’s 3.4-MW project to offset nearly all of Connecticut town’s energy usage

By Kelly Pickerel Standard Solar, Inc., a leading solar energy company specializing in the development and financing of commercial solar electric systems nationwide, has completed the installation of a 3.4 megawatt (MW) solar system for the Town of Stafford, Conn.
The 11,780 panel virtual net-metered system featuring three arrays: two at Stafford Middle School (1.296 MW each) and an 848-kW array at the Town’s closed landfill, will offset all of the school’s electrical usage and most of the Town’s other municipal buildings.
“Six years ago, the town formed an Energy Advisory committee and hasn’t been the same since. In that short span, the town has

Read Full Article Here

For more great articles: Solar Power World

(Visited 18 times, 1 visits today)

Comments

comments



© 2014 RenewaNews