Swift Current orders 1.2 GW of solar modules from First Solar

By Renewable Energy World First Solar said that Boston-based Swift Current Energy placed an order for 1.2 GWDC of First Solar’s thin film photovoltaic (PV) solar modules. The modules will be delivered in 2023 and 2024. Terms were not disclosed.

The order is the largest to date for Swift Current, which was founded in 2016 and has a pipeline of more than 6 GW of planned renewable assets across North America.

In December 2021, Swift Current agreed to buy 41 N149/4.X wind turbines from Nordex Group for Swift Current’s 196 MW Castle Gap Wind Project in Texas. The deal included a service contract covering

Read Full Article Here

For more great articles: Wind Power News – RenewableEnergyWorld.com

(Visited 1 times, 1 visits today)

Comments

comments



© 2014 RenewaNews