By [email protected] (Richard A. Kessler) US Wind’s 246-248MW first stage wind facility to be located off the Maryland coast would utilize 41 GE Haliade 6MW-150 turbines or 62, 4MW machines from an undisclosed vendor, according to studies done by regional grid operator PJM Interconnection.
Read Full Article Here
For more great articles: www.rechargenews.com
(Visited 10 times, 1 visits today)