By National Wind Watch The Walkaway wind farm in Western Australia has resumed some production after more than one month off line following the shock collapse of one of its turbines in early June. One of the wind turbines – number 43 turbine at the 54 turbine wind facility, also known as the Alinta wind farm – fell to the ground around 8.30am local time on June 8. It caused no other damage and no injuries, but it resulted in the facility being switched . . .
Read Full Article Here
For more great articles: National Wind Watch
(Visited 1 times, 1 visits today)